
Thamesmead
River Wall
- Principal clientTilfen Land
- ArchitectN/A
Tilfen Land is a property investment and development business undertaking asset management and the regeneration of land and property in the Thames Gateway. MSA has worked with Tilfen Land for over 15 years on this area, producing measured survey solutions including site and topographic plans, volume analysis and control surveys. Our extensive knowledge of the area and experience in maintaining the Control Network makes us a close strategic partner of the design team.
We are currently monitoring sections of the river wall which involves placing brass bolts in it as well as survey targets throughout the area. The results of the deformation monitoring survey enables Tilfen Land to monitor change and properly plan for the structural upkeep of the river wall.
Special features
- Recording and detecting sub millimetre movement using the most accurate equipment available
- Regular upload of results to the client's personal zone of our website allows them swift and easy access to the data they need
- Yearly site visits provide an intricate picture of movements in the area over time
"Regenerating land and property in the Thames Gateway by monitoring change and properly planning for the structural upkeep of the river wall. "
